How it works in practice — three use cases.

Using the same example data that also appears in the control center and in the other demos — synthetic, for illustration, not real customer data. Every step points to the place in the control center where you can verify it yourself. Each case shows an example from the power grid — and below it, how the same pattern looks in gas, water, wastewater, district heating and rail.

1

Before the Audit

An external auditor announces their visit for next week. Until now that meant: search through folders, ask colleagues, hope nothing is missing.

  1. The team opens the control center, view "Risk Status" — and sees at a glance where something is still missing: Compliance declaration missing — Substation South, blocking Gate G4 · Approval.
  2. Open items are closed before the appointment instead of only surfacing at the audit — the same logic as in the "Deadlines" view.
  3. On the day of the audit, the auditor scans the QR code on the asset nameplate and lands directly on the stored record — instead of first searching the archive or three different folder structures.
  4. Every status statement can be traced back to its record — that speeds up audit preparation. Important: supporting audit-readiness is different from guaranteeing an audit outcome, more on this in the FAQ "How does LAD support audits?".

The same pattern in other sectors:

Water

Well 3: water analysis record due in ~35 days, Gate G5 · Handover.

In the control center →
Rail

Switch 14: recurring inspection due in ~45 days.

In the control center →

Visible in the control center via the sector switch.

Example KPI · measurable in the pilot: search time to the record · share of traceable status statements. Demo example in the control center, "Risk Status" view. What today's search costs can be estimated with the ROI Calculator.

Walk through this case in a Fit Check →

2

Network Expansion Project Through Handover

Before the next status report, project management wants to know where delay actually threatens — not only once it has already occurred.

  1. A new asset is created — for example cable route A9: 2 records open, currently in Gate G3 · Construction.
  2. As construction progresses it moves toward Gate G4 · Approval — as with Substation South, where a missing compliance declaration is blocking the gate.
  3. Before the handover appointment, the "By Gate" view in the control center shows which assets at Gate G4 · Approval still have open records — steer course instead of improvising on handover day.
  4. Once everything is complete, the asset reaches Gate G5 · Handover and finally Gate G6 · Acceptance — as with the overhead line, where all records are already complete and Gate G6 · Acceptance has been reached.

The same pattern in other sectors:

Gas

Compressor Station East: pressure test overdue, blocking Gate G3 · Construction.

In the control center →
Rail

Control & Signalling Systems East: signalling acceptance test outstanding, blocking Gate G4 · Approval.

In the control center →

Visible in the control center via the sector switch.

Example KPI · measurable in the pilot: number of open handover items per gate. Demo example in the control center, "By Gate" view.

Walk through this case in a Fit Check →

3

Staff Turnover on the Team

An experienced person who has known an asset for years retires or changes jobs.

  1. Without a control center: the knowledge leaves with them — standards and exceptions often existed only in that person's head.
  2. With a control center: rules, chains of evidence and roles sit explicitly in the system, not tied to a person.
  3. The successor sees in the "By Team" view immediately what's open for their own team — for example the 4 open items at Network Expansion project management or the 2 at Asset Management.
  4. A staff change changes nothing about the chain of evidence — it stays traceable in the system, not tied to a person.

The same pattern in other sectors:

Wastewater

Wastewater Treatment Plant Central: inspection report overdue, blocking Gate G4 · Approval.

In the control center →
District heating

CHP Plant North: emissions measurement due in ~55 days.

In the control center →

Both sit in the system — not only in the head of the person who knows the asset. Visible in the control center via the sector switch.

Example KPI · measurable in the pilot: share of traceable status statements. Demo example in the control center, "By Team" view. More on this in the FAQ "What happens when staff change?".

Walk through this case in a Fit Check →

How it works on your own network.

30 minutes, no system access: using your use case we check whether a pilot area can be clearly scoped — no slide deck.

  1. Send a requestBriefly, your topic and your sector.
  2. 30-minute conversationOn your use case, no system access.
  3. A clear answerWhether a pilot area can be clearly scoped.
Request 30-minute Fit Check

All three scenarios use the same synthetic example data that also appears in the control center and in the document room demo — not real customer data. How it looks with your own assets and your own network is something we work out without obligation in a discovery call.