Decommissioning, dismantling, disposal — records through to release from nuclear regulatory control.
A draft catalog for nuclear power plants in decommissioning and dismantling under Section 7(3) of the German Atomic Energy Act — residual operation, dismantling, clearance, radioactive waste, transport and interim storage, radiation protection, and supervision and security through to release. Power operation, fuel supply and final repository operation are not included.
This sector relative to all twelve — gold for this one, hatched for sectors in development.
0595 ⁄ 12,728 ≈ 4.7 %12,728 document types
Nuclear powerestablishedin development
Clusters in the draft catalog.
The clusters follow the structure of the draft catalog. Expert review is under way; in the pilot we align it with your requirements.
Decommissioning and dismantling
Licensing, dismantling phases, residual operation — from application to release.
Residues and clearance
Clearance measurement, clearance procedure and residue tracking.
Radioactive waste and conditioning
Waste concept, package documentation, product control.
Supervision, safety and security
Operating manual, reportable events, nuclear material, expert reviews.
Radiation protection and monitoring
Radiation protection instructions, work permits, dosimetry, instruments.
Cross-cutting nuclear
Management system, project control, public information.
Interim storage and transport
Shipment, cask loading, handover to interim storage.
Conventional demolition and reuse
Demolition planning, site diary, monitoring after demolition.
Interim storage operation
Emplacement, cask record, leak-tightness monitoring.
Digitalisation and data
Data model, 3D scanning, room register as dismantling progresses.
Typical records — a selection.
A few document types from this sector’s catalog. Each type is a defined record object — with mandatory fields, deadlines and gate assignment.
- Application for decommissioning and dismantling
- Controlled-area room register
- Building measurement record (in-situ gamma spectrometry)
- Residue tracking slip
- Waste package documentation for product control
- Cask loading record
- Radiation work permit
- Notice of release from nuclear regulatory supervision
This is how nuclear decommissioning looks in the control center.
Documentation coverage per area, approval gates, risk lights and deadlines — with synthetic sample data, the same view as in the pilot.
Open the control center with this sector →What “in development” means.
The catalog exists as a draft: counted, structured, with the same attributes and rules as the established sectors. Expert review is still open — and that is exactly what we carry out in the pilot together with your specialists.
Review the draft catalog together?
30 minutes, no system access — on your use case.